University of Wisconsin-Parkside Digital Collections

Browse Items (27 total)

  • Tags: construction

UWPAC002_P_1265.jpg
An aerial view shows Tallent Hall during the summer. Several temporary buildings can be seen in the background. The northeast corner of the building is shown.

UWPAC002_P_1263.jpg
Windows of Tallent Hall.

UWPAC002_P_1262.jpg
Tallent Hall, under construction, March 1969.

UWPAC002_P_1261.jpg
One of the windows of Tallent Hall.

UWPAC002_P_1260.jpg
Tallent Hall, under construction, 1969.

UWPAC002_P_1259.jpg
Tallent Hall, under construction, 1969.

UWPAC002_P_1258.jpg
Tallent Hall, under construction, March 1969.

UWPAC002_P_1255.jpg
The main entrance of the former library was remodeled in the summer of 1973.

UWPAC002_P_1254.jpg
The lower level of Tallent Hall was remodeled in the summer of 1973.

UWPAC002_P_1253.jpg
The lower level of Tallent Hall was remodeled in the summer of 1973.
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2