University of Wisconsin-Parkside Digital Collections

Browse Items (27 total)

  • Tags: Construction

UWPAC002_P_1162.jpg
Larry Robbins holds the construction plans for the campus expansion.

UWPAC124_19970130.pdf
Student newspaper of the University of Wisconsin-Parkside, Kenosha, Wis.

UWPAC124_20081021.pdf
Student newspaper of the University of Wisconsin-Parkside, Kenosha, Wis.

UWPAC124_20090210.pdf
Student newspaper of the University of Wisconsin-Parkside, Kenosha, Wis.

UWPAC002_P_1249.jpg
The Tallent Hall lunchroom was remodeled in the summer of 1973.

UWPAC002_P_1253.jpg
The lower level of Tallent Hall was remodeled in the summer of 1973.

UWPAC002_P_1254.jpg
The lower level of Tallent Hall was remodeled in the summer of 1973.

UWPAC002_P_1255.jpg
The main entrance of the former library was remodeled in the summer of 1973.
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2