University of Wisconsin-Parkside Digital Collections

Browse Items (267 total)

  • Tags: buildings

UWPAC002_P_1175.jpg
The career resource center assisted students in planning their occupation after graduation. John Elmore (director of student development) is talking to several students. The center was located in Tallent Hall before moving into the library-learning…

UWPAC002_P_1162.jpg
Larry Robbins holds the construction plans for the campus expansion.

UWPAC002_P_1161.jpg
Picture of construction on Greenquist and Wyllie Hall.

UWPAC002_P_1160.jpg
Construction workers stand on the roof of Greenquist while it is under construction.

UWPAC002_P_1159.jpg
James Galbraith is looking at new building construction from the roof of Greenquist Hall.

UWPAC002_P_1140.jpg
James Galbraith was the director of Planning and Construction in the 1970s. In this scene, he stands amongst prairie grass holding plans for a future building.

UWPAC002_P_1045.jpg
An exterior view of the Racine Center.

UWPAC002_P_1044.jpg
An air view of the exterior of the Racine Center.

UWPAC002_P_1043.jpg
A night view of the Racine Center.

UWPAC002_P_1042.jpg
Racine Center-Exterior. Main Hall foreground.
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2